We have a 14 floor building. Site has started pouring the concrete prior to electrical project being complete and they're up at 8th floor. We've been told that no foundation grounding was installed.
Q1: in this case, is foundation earthing required by the code? I know that this is still considered a new building as per 250.50. I do not feel safe about this anyway, where do I go in the code to prove my point?
Q2: how do we connect to the re-bar of a finished foundation? We had planned using exothermic welds previously.
thanks for helping this newbie!
Q1: in this case, is foundation earthing required by the code? I know that this is still considered a new building as per 250.50. I do not feel safe about this anyway, where do I go in the code to prove my point?
Q2: how do we connect to the re-bar of a finished foundation? We had planned using exothermic welds previously.
thanks for helping this newbie!