I have switchboard replacement in outpatient hospital like setting that has essential branch. In the time existing switchboard disconnected and new switchboard install they are powering the hospital thru temporary generator.
However they need to determine existing loads so they can size the temporary generator accurately. Can they use NEC 2017 Article 220.87 for sizing the temporary generator in my setting