When install a new transfer switch on existing service, must I now go inside the distribution panel and remove MBJ and relocate it to the transfer switch and then install 4 wire feeder to panel??
It should be located in the transfer switch if that is your first means of disconnect.
Don't forget to separate the grounds and neutrals in your panels inside.