Maybe this has already been addressed,correct me if I/am wrong but it is not an NEC requirement to install a grd rod @ a site lighting pole.I ask this because a G.C. is telling me he has never seen site poles done without grd rods @ the poles.I told him this is required when designed or shown as a detail, not an NEC requirement...