slipstream
Member
To expand more on my ground rod delima. There are 3 overhead meters on one pole with one service drop from the power company to catch all 3. The meters are customer owned. No disconects are on the pole. The service continues from each meter to its corrisponding building (underground) to a 200A main breaker panel. The water systems are plastic and the buildings are wood frame. We are not required to hit the footer steele for grounding. Ground rods are sufficent here. I need in put on wether 2 rod or 6? Do all rods have to maintain 6' spacing or just the corrisponding pair for each meter?