powerplay
Senior Member
- Location
- In front of a computer.
The Overhead Three Phase 200amp Service has over 10K fault current available, so the Disconnect Switch is before the BC Hydro Meter for the Meter Technicians safety. I Ground the Neutral at the Panel to ensure 150volts to ground from the Breakers, but is it better to connect the System Ground to the Main Disconnect Switch before the Meter?