M. D. the EC is not responsible for the mis-actions of the GC.
That is why that text I posted from MA went out to GCs not ECs.
In the text of the letter it describes how the GC must hire an EC to do the footing work if there will be steel in it.
They go on further to explain that the EC hired to do the footing work need not be the one to do the actual service and building.
So even without an EC chosen for the entire job the GC must get an EC out to do the footing work.
Makes perfect sense to me.
It also means a sizable extra for 'PITA' factor if the GC missed the uffer and we have to chisel in to get it.