Cleveland Apprentice
Senior Member
- Location
- Cleveland, Oh
Today I changed out an old federal pacific panel and replaced with siemens 100 amp panel.  The old main service leads were a little too short to land on the main breaker in the new panel.  I used aluminum mechanical set-screw type connectors to extend the hots and terminate on the main breaker.  The inspector looked at it and questioned me why I didn't run new copper from meter base to main breaker.  I told him that HO didn't want to spend extra money and wanted to go the cheapest route.  The inspector kinda shook his head and said he would pass me.  I had the vibe that the inspector was debating whether to pass me or not. I'm just wondering if anyone else had a similar experience with a inspector like this.  Thanks.
	
		
			
		
		
	
				
			 
				
 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		