malachi constant
Senior Member
- Location
- Minneapolis
I'm picking a main for a commercial building. What would you go with and why?
Details: 1600A 208V 3P 4W. All my downstream devices will be fused switches. In the past I would have gone with a BPS but the more I read about their history of spectacular failure (when not maintained) the less inclined I am to use them.
Thanks!
Details: 1600A 208V 3P 4W. All my downstream devices will be fused switches. In the past I would have gone with a BPS but the more I read about their history of spectacular failure (when not maintained) the less inclined I am to use them.
Thanks!