So related to my temp scenario:
We were not able to procure a outdoor branch panel in time so we are using (3) disconnect switches to feed the disconnects/trailers.
I proposed coming out of the secondary side of the xfrm with the (3) cables to each of the (3) 2 pole disconnects(125A,60A &60A) 25' away.
The foreman said he would rather not come out of the transformer with three cables. I think he's not sure how wire three cables to the secondary side of the xfrmr...... I think it would be phae A-B, B-C and A-C, correct?
He would rather now run one larger cable from the transformer mount a splice box and splice down to the (3) cables for the 125A, 60A and 60A disconnect.
I think he's creating more work by doing it this way. Any thoughts?
We were not able to procure a outdoor branch panel in time so we are using (3) disconnect switches to feed the disconnects/trailers.
I proposed coming out of the secondary side of the xfrm with the (3) cables to each of the (3) 2 pole disconnects(125A,60A &60A) 25' away.
The foreman said he would rather not come out of the transformer with three cables. I think he's not sure how wire three cables to the secondary side of the xfrmr...... I think it would be phae A-B, B-C and A-C, correct?
He would rather now run one larger cable from the transformer mount a splice box and splice down to the (3) cables for the 125A, 60A and 60A disconnect.
I think he's creating more work by doing it this way. Any thoughts?