1793
Senior Member
- Location
- Louisville, Kentucky
- Occupation
- Inspector
I've heard of them, but never thought much about it.
I need to drive a second ground rod to satisfy an inspector on this job. ... I can run a new wire but it will take about 45 minutes or so.
Thanks,
Is this a Supplemental Ground or the Main/Primary GEC?