ggunn
PE (Electrical), NABCEP certified
- Location
- Austin, TX, USA
- Occupation
- Consulting Electrical Engineer - Photovoltaic Systems
Does the NEC say that? I can see why the KAIC rating is important; if the fuses on a line side connection don't clear a fault then you burn the building down.That SCCR still needs to be larger than the fault current available at that point, IMHO.