PeteDMC
Member
- Location
- Carrboro NC
- Occupation
- Electrician
Have a GE and Siemens supplier who is telling me Gangable meter banks (6 meters) for an apartment complex have a 13 month lead time. Anyone have better luck with a different brand, or is it the same for Square D and Cutler Hammer? Thanks
In NC, but I assume this is basically the same nationally.
In NC, but I assume this is basically the same nationally.