hole house generator with auto transfer switch in basement. unit sitting out side next to service meter. we used the same ground rod as the service for the generator putting the bare copper under ground 4 ft back to the rod. inspector
failed it said it had to have its own rod. and that the generator ground should not be tie to the water line. can some one explain this to me.
failed it said it had to have its own rod. and that the generator ground should not be tie to the water line. can some one explain this to me.