mdshunk said:I'll only do hot work on the big stuff indoors where an arc flash study has been done. The facilities where you absolutely have to do hot work have mostly all done arc flash studies by now. This dictates the PPE and any maintenance GFP settings that are to be used. For outside work, there is a long history of the PPE that needs to be worn and the tools that need to be used at various voltage levels.
Marc,
Thats great that the facilites that you work in already have the Arc flash studies done. I wish the places I worked at wer more proactive in this way. Most the time they look at me funny when I say that the panel should be shut down.
Bob is right if we all get on board with the requirements of 70E there should be no problem maintaining work.