138lawfull
Member
I have an oppertunity to bid a job on on some pumps that require 480V, 3 Phase. The run is 1 mile 5300 feet (+ -). I was thinking dirrect burrial 250MCM AL. Anybody have any experiance doing such a job? Found a great site for voltage drop(www.csgnetwork/voltagedropcalc.html). Anyone ever trench that far in easy soil?
How long do you think it may take to trench that far? Any imput would be helpful.
Thanks,
Terry.
How long do you think it may take to trench that far? Any imput would be helpful.
Thanks,
Terry.