Hello Everyone I have a question. I am in a 6000 sq foot building for over 35 years. It used to be a factory. I have a 3 phase service coming into my building 120/120/208 + neutral . I think it's called a Delta Wye. As soon as the 4 wires enter the building, they go into an enclosed electrical box whereby they are each doubled so they can split off to 8 wires.
4 wires go straight up to a mains panel with 200 amp main breaker and the other 4 wires go to a large disconnect with fuses. IN this large disconnect the neutral meets the case of the disconnect metal shell and the water pipe ground. the output of that goes to a 100 amp sub panel ..
The main 200 amp breaker panel does not have the neutral bonded to its case , (just like my sub panel) is this ok? or should I connect the mains 200 amp breaker panel from the large disconnect where the other sub panel comes from?
4 wires go straight up to a mains panel with 200 amp main breaker and the other 4 wires go to a large disconnect with fuses. IN this large disconnect the neutral meets the case of the disconnect metal shell and the water pipe ground. the output of that goes to a 100 amp sub panel ..
The main 200 amp breaker panel does not have the neutral bonded to its case , (just like my sub panel) is this ok? or should I connect the mains 200 amp breaker panel from the large disconnect where the other sub panel comes from?