Pullnwire
Senior Member
- Location
- Surrounded by Oranges
- Occupation
- Electrician, Business Owner, SME and Trade Instructor
I have a new client, Who is a university here in So. Cal, And they have asked me to provide a quote to do PMs on 5 large transformers, 2 300KVA 480-208/120 and 3 12KV- 480/277 transformers. THey are 1000KVA down to 500KVA.
My question is, Can I perform a Visual inspection, thourough cleaning, and look for hotspots without any special training / certs? Everything will be de energized, and I could do 480 in my sleep, But, I am not that familiar with the 12kv stuff. Is there anything I should, should not do? Should I just let this one go?
THanks for any input.
My question is, Can I perform a Visual inspection, thourough cleaning, and look for hotspots without any special training / certs? Everything will be de energized, and I could do 480 in my sleep, But, I am not that familiar with the 12kv stuff. Is there anything I should, should not do? Should I just let this one go?