Hey guys, I am trying to get a definitive answer that is code compliant when leaving the meter base in a home on the load side to then feed the main panelboard what conductors leave in the conduit the then go feed the main panelboard?
I have seen it two ways and am wondering which way is code compliant.
Is it..
A)2 ungrounded conductors, 1 neutral, and 1 equipment grounding conductor
Or
B)2 ungrounded conductors, and 1 neutral...no equipment ground needed
This is in reference to residential
Please give code reference to support your thoughts.
Thanks in advance!
Sent from my Moto Z (2) using Tapatalk
I have seen it two ways and am wondering which way is code compliant.
Is it..
A)2 ungrounded conductors, 1 neutral, and 1 equipment grounding conductor
Or
B)2 ungrounded conductors, and 1 neutral...no equipment ground needed
This is in reference to residential
Please give code reference to support your thoughts.
Thanks in advance!
Sent from my Moto Z (2) using Tapatalk