NashElectric
Member
- Location
- Texarkana
Hello please help I need clarification.
We have a Inspector here in Texarkana Texas that now says we cant run from the outside meter gang center that has a main by each meter thru the building to the spaces. That they have to be on the outside of building or come up under the concrete. we work all over and service are ran this way in strip centers and outlet malls from little rock to dallas. They are protected outside by a main so what is the difference in them and a house lighting circuit running space to space to feed wall packs ect.
Also we have always if there was a client who wanted to take like 2 spaces and the center was setup for only 200 amps per space that we could install 2 metters for that one business as long as it was labeled that the is space was serviced by two meters.
so my question is can a business take up 3 spaces that are connected and setup up for 3 200 amp panels in each space have three meters in the meter gang center and be labeled that this space is served by 3 meters.
We have a Inspector here in Texarkana Texas that now says we cant run from the outside meter gang center that has a main by each meter thru the building to the spaces. That they have to be on the outside of building or come up under the concrete. we work all over and service are ran this way in strip centers and outlet malls from little rock to dallas. They are protected outside by a main so what is the difference in them and a house lighting circuit running space to space to feed wall packs ect.
Also we have always if there was a client who wanted to take like 2 spaces and the center was setup for only 200 amps per space that we could install 2 metters for that one business as long as it was labeled that the is space was serviced by two meters.
so my question is can a business take up 3 spaces that are connected and setup up for 3 200 amp panels in each space have three meters in the meter gang center and be labeled that this space is served by 3 meters.