stickboy1375
Senior Member
- Location
- Litchfield, CT
These were the readings I got at the panel, anyone wanna take a guess at the problem?
First off, this is a 208v single phase service.
L1 + N 121 V
L2 + N 116 V
L1 + L2 208V
now for the amperages....
L1 - 15A
L2 - 35A
N - 35A
Also had 15A on the GEC connected to the city water bond.
First off, this is a 208v single phase service.
L1 + N 121 V
L2 + N 116 V
L1 + L2 208V
now for the amperages....
L1 - 15A
L2 - 35A
N - 35A
Also had 15A on the GEC connected to the city water bond.