"Aha, but there is nothing stopping us from using the same GE or GES for multiple structures, even if a lengthy GEC is needed. "
Ok i agree we can share the ground rods.
So if the first rod or rods are at the pole and we go from that service to the mobile panel with 4 wires are we not indeed connecting the rods to the mobile panel by way of the grounding conductor ? Or is there a problem because they are not continuious from the rod ?
"Aha, but there is nothing stopping us from using the same GE or GES for multiple structures, even if a lengthy GEC is needed. "
Ok i agree we can share the ground rods.
So if the first rod or rods are at the pole and we go from that service to the mobile panel with 4 wires are we not indeed connecting the rods to the mobile panel by way of the grounding conductor ? Or is there a problem because they are not continuious from the rod ?