electricalist
Senior Member
- Location
- dallas tx
Im not sure how clear this came out. I can take another.
Panel CL for instance, the circuits are all over the place. They arent grouped very well in my opinion.
with 3 circuits per conduit home run, I end up with areas the may have 2 same phase and one different.
You guys that know what I should do , any advice will be appreciated, if this is my lesson to learn I understand.
1 group them by distance and dont worry about if it ends up 3 a phase circuits, which leads to more identification and switching wire on wire pulls.
2 group a phase b phase c phase in each home run conduit. Although some wont work out, but less chance of a mistake.
3 re circuit the whole thing to be black red blue in each conduit and redo the panel schedule to be even circuits on one side of the bldg and odd on the other, and deal with what ever conflict it may bring.
Sent from my GT-N5110 using Tapatalk