Hi, I need to install the new lever bypass meter base that will shift everything over about 2.5in which would put the panel right where that change in siding is. Due to where the circuits come in I can't lower it enough to go under and I'm trying to not move the mast over 2.5in. Does anyone have any ideas on what can be done? I was thinking of doing a gutter above the meter so I can move the meter base over without moving the mast not sure if utility would allow it though. Is there any lever bypass meter bases that have the hub on the right? Just looking for ideas. Thanks