I need to install a few disconnects inside CT scan rooms and Mri rooms. They are installling lead on outside walls of room and covering the jboxes. I am not sure how to proceed with installation of disconnects inside the room. Would the disconnects need to be sheilded also as it enters the room or does the entire disconnect need to be shielded also? I dont have much experience with this type installation. I could use some help.