kwired
Electron manager
- Location
- NE Nebraska
- Occupation
- EC
Well guys like to do similar. They often further confused by the need for increased conductor size because of the length out to well plus down the well casing to the submersible. Their charts might say they need to run 10 AWG to the motor, but drive input rating is still less than 20 amps and is not a long run to the panel but they think they need a 30 amp circuit and 10 AWG on the supply also.