Okay, here's my delima!
Got a building that has a POCO pad mount transformer out front in the yard. Building has two different service entrances, both inside the building far from the outer walls and both fed from that transformer out front. Service #1 is 1000A, 120/208V, 1000A MCB. Service #2 is 1200A, 120/208V, 1200A MCB. Feeders for both services are buried beneath the slab and, technically, enter the building directly into the bottom of each of the service cabinets. Owner now wants to install a generator to run the entire facility during a utility outage. (his cost of lost production is astronomical!!) It has been proposed that we install a 2000A 120/208V service entrance rated ATS beside the POCO transformer. ATS has a 2000A SER Main Breaker on utility line side. It has also been proposed that we tap the load side of the transfer switch to feed the two services. 240.21(B)(5) seems to support this approach, but my gut tells me we need to install OCP and/or disconnecting means for each feeder at the ATS. I suppose the existing main breakers at each service will protect their line side conductors just as before, but it just seems strange to me.
Your thoughts and comments will be greatly appreciated! Thank-you!
Got a building that has a POCO pad mount transformer out front in the yard. Building has two different service entrances, both inside the building far from the outer walls and both fed from that transformer out front. Service #1 is 1000A, 120/208V, 1000A MCB. Service #2 is 1200A, 120/208V, 1200A MCB. Feeders for both services are buried beneath the slab and, technically, enter the building directly into the bottom of each of the service cabinets. Owner now wants to install a generator to run the entire facility during a utility outage. (his cost of lost production is astronomical!!) It has been proposed that we install a 2000A 120/208V service entrance rated ATS beside the POCO transformer. ATS has a 2000A SER Main Breaker on utility line side. It has also been proposed that we tap the load side of the transfer switch to feed the two services. 240.21(B)(5) seems to support this approach, but my gut tells me we need to install OCP and/or disconnecting means for each feeder at the ATS. I suppose the existing main breakers at each service will protect their line side conductors just as before, but it just seems strange to me.
Your thoughts and comments will be greatly appreciated! Thank-you!