They are expected to see if a label exists. They are not required to personally verify the values on the label. Just like they are not required to perform load calculations and wire sizing.AHJs:
Are now expected to review arc-flash labels
This point was raised prior to the IEEE 2018 version being released. Have you looked at the old discussions on Arc Flash sites like the arcflashforum on brainfiller.com?NEC 2026 has functionally mandated the use of IEEE 1584, and IEEE 1584 is only realistically accessible through licensed software or specialized consultants.