erickench
Senior Member
- Location
- Brooklyn, NY
I'm looking at the 2011 NEC, haven't picked up my 2014 edition yet lol. The above exception reads:
Where the individual disconnecting means consists of fused cutouts, the simultaneous disconnection of the ungrounded supply conductors shall not be required if there is a means to disconnect the load before opening the cutouts.
What is a means that disconnect the loads before opening the cutouts? Any examples?:?
	
		
			
		
		
	
				
			Where the individual disconnecting means consists of fused cutouts, the simultaneous disconnection of the ungrounded supply conductors shall not be required if there is a means to disconnect the load before opening the cutouts.
What is a means that disconnect the loads before opening the cutouts? Any examples?:?
 
				
 
 
		 
 
		