Shujinko
Senior Member
I have a proposed design where there are 3 service disconnects in the same chiller room but they are on different walls and not in line of sight of each other. Is this considered to be "grouped" as required by NEC 230.40 (Exception #2) and 230.71(A). These are all fed from the same pad mounted utility transformer with separate service laterals.