Ok, another question on GFP for hospitals. in 517.17(B) 2005 NEC it says the additional levels shall NOT be installed on the (emergency)essential system and between the generating unit onsite.
Why would it be ok to install the gfp between the essential system transfer swith if the generating unit is NOT onsite??such as another utility service?? it referrences 517.35(B), . Am i reading this wrong or is this just an oversite, or is there justification of this issue.
Why would it be ok to install the gfp between the essential system transfer swith if the generating unit is NOT onsite??such as another utility service?? it referrences 517.35(B), . Am i reading this wrong or is this just an oversite, or is there justification of this issue.