Yeah, I hear you. I had already run all the conduit feeding the brewhouse control panel (which will frequently be hosed down) and all the components (3 phase motors, temp sensors, 120V and 24V limits and sensors, etc.) in EMT and a little sealtight with RT fittings and bell boxes and the inspector signed it off with flying colors. This was my first brewery and hopefully my last. It was not an enjoyable project. Looking back, there were a lot of things I would've done differently.
For reference and future, would it be best to do an install like this in PVC or GRMC? What is the best style pull/splice boxes?