mstrlucky74
Senior Member
- Location
- NJ
So you have a multi story building with decks being poured and a hoist. I assume the hoist is always a few floors behind the deck pours. How does the electrical crew/layout guys get from the last hoist floors to the deck being poured? Stairs I imagine??:dunce:
How about the equipment the might be to heavy to lug up the stairs? Crane?
How about the equipment the might be to heavy to lug up the stairs? Crane?