Hello all,
I am trying to find information regarding a situation I am in regarding a new PV install. I can't seem to find what I am looking for in the 2014 code. The PV system is using micro-inverters at each panel that terminate to wires going to the PV input in the combiner panel. This combiner panel Enphase IQ panel and has 3) 20-amp breakers for the input. The client also has a backup generator with an automatic transfer switch. How would I go about hooking all this up? My load side of the meter is coming to my transfer switch and hitting a double lug that my backup power also terminates to. My service panel then comes out of the load side of the transfer switch. Do I just need to run a pair of properly sized wires from my combiner output to the line side of my transfer switch or do I need a disconnect in between?
I am trying to find information regarding a situation I am in regarding a new PV install. I can't seem to find what I am looking for in the 2014 code. The PV system is using micro-inverters at each panel that terminate to wires going to the PV input in the combiner panel. This combiner panel Enphase IQ panel and has 3) 20-amp breakers for the input. The client also has a backup generator with an automatic transfer switch. How would I go about hooking all this up? My load side of the meter is coming to my transfer switch and hitting a double lug that my backup power also terminates to. My service panel then comes out of the load side of the transfer switch. Do I just need to run a pair of properly sized wires from my combiner output to the line side of my transfer switch or do I need a disconnect in between?