Hello, I will be running 6/3 wG through my unfinished basement to the opposite end of the house for a hot tub disconnect subpanel. My question is how best to get from inside the basement to the subpanel outside? I was thinking a short length of pvc conduit through the rimboard into an LB and up approximately 2' to the panel. But I have two reservations with this: 1) I'm not sure I can run the nm through conduit (even short lengths) and 2) I'm not sure the 6/3 can turn 90deg up in the LB.
What's the best way to handle this? And thanks!