2 220/221 Senior Member Location AZ Mar 16, 2008 #61 Maybe because that is the before pic and they had been cut :grin:
acrwc10 Master Code Professional Location CA Occupation Building inspector Mar 16, 2008 #62 220/221 said: The electrons in AZ prefer a smooth even flow around a nice radius. It cuts down on the monthly bills as much as 12%. BTW, all that stuff was CRAMMED into a twinned up panel before. Click to expand... With all that tape on the merer socket side service conductors I have to ask, Were you working this live ? And did you get an inspection ???????????:roll:
220/221 said: The electrons in AZ prefer a smooth even flow around a nice radius. It cuts down on the monthly bills as much as 12%. BTW, all that stuff was CRAMMED into a twinned up panel before. Click to expand... With all that tape on the merer socket side service conductors I have to ask, Were you working this live ? And did you get an inspection ???????????:roll: