no bonding grid installed

Status
Not open for further replies.

mh183

Member
there was no grid inspection. walkway was pored,and now its a mess.
what do you guys think if we now installed a grid and pored again or installed pavers rather then rip it up.
 
mh183 said:
there was no grid inspection. walkway was pored,and now its a mess.
what do you guys think if we now installed a grid and pored again or installed pavers rather then rip it up.

I would think that a grid on top of a slab would work just, but what do I know...:grin:
 
I think they should make them rip it up. I see this alot now. People have hot tubs installed and they dont put them in. some people need to learn the hard way.
 
Pavers also require the bonding grid. IMO a top coat of concrete over the bonding grid is a good solution.
 
Status
Not open for further replies.
Top