Hard to see it in the picture but why not just go strait up above the next window and eliminate the last 90?
 
Closed out this job and it was a case of
the dog that didn't bark.

Wires slid right down the 2" pipe.
all good! thanks guys =)
 
300, 300, 2/0
built a platform and hoisted up the service pipe with a simple pulley
brought the wire down from the window above
the lube was hardly necessary


I do believe that building anything in your imagination first is very useful