Schedule 80 PVC would be ok I guess, but i would use rigid metallic conbuit myself! Especially if this is a feeder for a panel or something carrying a lot of current like a pool or spa.
It is a feeder for a 200a residential loadcenter from a combination meterbase/disco.
This is in a jurisdiction that I've never worked in before. If I can't get any input from the AHJ, I may go with emt. Good compromise between rnmc and rigid?
Bennie's right,but it says " severe physical damage"in 358.12(1).
In any event I just got a call from the AHJ ,and I meet with him Tuesday next. I guess I'll get HIS defination of Physical Damage.Good of him to call from his home,I hope thats a good sign.
Btw Roger, It's in Andrews. Maybe you can come and inspect this one.
Thanks for the replys, I'll post back with the results of the conversation.