Cjmccarthy
Member
- Location
- Florida
- Occupation
- Project Coordinator FDOT
I have a job where the contractor pulled the conductor from the pull box through a 2 inch buried conduit directly into the disconnect 350' away. This is not the way every other job has been done for the FDOT, I have been looking through the NEC code book trying to find where they would need to put a pull box at the service pole, is there a code I can use?