PietroAZ
Member
- Location
- Santa Cruz Valley AZ
- Occupation
- Retired
In the course of a ceiling demo I have come across a pull box that had no splices, just #12 conductors passing through with no access ...without removing drywall. It would have been done in the 1980's
I read 314.29 as must be accessible, Boxes,conduit bodies ...
Correct that this is not currently proper?
I read 314.29 as must be accessible, Boxes,conduit bodies ...
Correct that this is not currently proper?