I have about 140ft of buried 2" conduit with 4/0-4/0-2/0 URD from the utility that needs to be repurposed and turned into a feeder. So I will have to pull in a ground wire. I am pretty sure we'll have to pull all of it out and pull back in with the ground but I wanted to run it by all you first.
Any chance of getting the ground wire in without pulling old service wires out first? I cannot think of a method that I'd have confidence in working but I haven't been at this that long either. Thanks.
Any chance of getting the ground wire in without pulling old service wires out first? I cannot think of a method that I'd have confidence in working but I haven't been at this that long either. Thanks.