If someone wants to run some PVC in a slab they are pouring for a new hot tub is there anything they should watch out for? I looked up the requirements for the minimum cover requirements in table 300.5 and see that, if it in the ground, it needs to be 4" below a 4 inch slab, or 12" below a 2" slab, but what if they want to actually put it in the pour? Thank you!