I have five disconnects on the outside of a building. I want to bring all my line side branch conductors in through the first disconnect, to the second, to the third, to the fourth and then to the fifth. I then want to route my load conductors back in the same race way. this is only an example and not a good practice in my opinion, but is a code violation??