Re: romex wire
Originally posted by busman:
45 min. drive to permit bldg. (no on-line permits)
45 min. in permit line (could be much longer)
45 min. return drive
Arrive at site day of job and wait for PoCo
Do rough wiring (HO without power all day)
Wait for PoCo to reconnect
Call for rough inspection
Return for device installation
Call for final inspection
The bottom line is a 1 hour job takes 1-1/2 to 2 days. HO will NOT pay $600-$800 for a single circuit (nor should they have to).
Mark
Lets look at the time line doing it your way:
2 minutes to take off the panel cover.
5 minutes working in the panel energized.
.2 second arc flash for unitentional contact with energized bus.
20 minutes on the ground with second degree burns, a complete loss of hearing, hair burnt off, naked, and one eye with 3 inches of metal stuck in it.
6 weeks in the intensive care unit.
$20,000 to the anesthesiologist.
$15,000 to the skin graft doctor.
$75,000 to the hosipital.
4 months in therapy, oh another $10,000.
6 months out-of work, but you can't go back to your job because your employer was sued to bankruptcy because you blew up his clients equipment room, you only have one eye that works, and 3 fingers on your right hand had to be removed.
Your wife has left you for a man with a full head of hair and for some reason you have never regained your sense of smell.
Its your choice, I'll settle for the horibbly inconvienent day at the building department.