construct
Senior Member
- Location
- Branson, Missouri
Close, not so much the type of building constructed but the kind of building that could have been constructed.
For instance you can run NM in a Type I or Type II building as long as the code would have allowed that same building to be Type III, IV or V.
I agree.
Also can be based on the occupancy (use). For instance, not allowed in assembly occupancies covered in Article 518.