Machiavelli999
Member
I have hooked up some equipment to a 112.5KVA transformer and the load is turning out to be more than I expected. On a 112.5KVA transformer, we are measuring an average load of 76KVA and a peak load of up to 85KVA.
Everything is working fine but how concerned should I be at running the transformer at 70-75% of its rated capacity? Any thoughts?
Everything is working fine but how concerned should I be at running the transformer at 70-75% of its rated capacity? Any thoughts?