Project has a 400a 480v 3p 4w service. The meter disconnect and meter sit outside. The service disconnect sits inside building. We are installing a new generator/ats. The ats is proposed to go outside. Will a new service disconnect need to be installed between meter and ATS because we are installing the ATS outside.