USMC1302
Senior Member
- Location
- NW Indiana
My brother has an existing UG service to his modular home. He built an adjacent pole barn 30x45 a few years back and now wants power, but he intends to build a new house and demo the existing in the near future. POCO has told him they could provide new 400A service at the barn and he could put a 200A panel there and disconnect for future house. I told him I thought he was nuts if he thought he needed a 400A (320) service, but that's his to figure out with an EC. My question is how to feed the existing house until he starts construction?
His current house panel would then require a 4 wire feeder correct?
His current house panel would then require a 4 wire feeder correct?