Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
If you had a lot of vertical feeders and MI Cabled running 7-8 floors in existing building and you had to core the closets( which are stacked) for openings or had an open shaft where the GC would building platforms on each level which install do you think would be quicker? I know limited info....but I'd think possibly the shaft because you would not be coring.?????